Boundary walls, gates, driveways, pergolas, shades, lighting and everything outside the villa.
This is our complete villa exteriors package: build the boundary, hang the gate, lay the driveway, shade the parking, shelter the seating and light the whole thing.
Because the same crew handles civil, metal, paving and electrical works, levels, drainage falls and fixing details line up instead of being argued over between trades.
260
Civil, steel, paving and electrical crews scheduled together.
Falls and gullies designed so driveways never pond after rain.
Gate motors, intercoms and smart control wiring included.
Every stage is inspected and documented, and you receive dated photographic evidence of progress.
Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.
Drawings, 3D views where required, and a transparent itemised bill of quantities.
Municipality, community and DEWA permits prepared, submitted and followed up for you.
Structured execution with weekly reporting, QC checklists and stage inspections.
Snag-free finishing, warranties, as-built documents and key handover.
3D facade concepts, material boards and lighting layouts before a single block is cut.
Recladding, repainting, repaving and lighting upgrades that modernise an old facade.
Facades, ACP cladding, canopies, automatic doors, staircases and railings for buildings.
Yes. Facade, boundary-wall and gate changes normally need developer/landlord NOC plus municipality approval. We prepare drawings and submissions and wait for the green light before ordering materials.
Most works are done externally and can run while you are at home. We protect landscaping, keep access clear and work within the community noise hours.
Porcelain and natural stone for paving, powder-coated aluminium and ACP for cladding, stainless or hot-dip galvanised steel for gates and railings — all chosen for heat, humidity and salt resistance.
A driveway with base course and porcelain pavers takes 2–4 weeks. Boundary walls with gate and lighting usually run 3–6 weeks depending on length.