Sat – Thu : 8.00 – 18.00
Swimming Pools • Service

Pool Remodel

Modernise an old pool's shape, finish and features for a resort look.

Pool Remodel
4–8 weeksTypical timeline
4–8 weeksProduction programme
Swimming Pools divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Pool Remodel in Dubai

Remodeling changes the pool's character: a new infinity edge, an extended sun shelf, a raised spa, a modern deck, integrated seating or a lighting scheme that turns the pool into the evening centrepiece.

We reshape what exists and rebuild what must change, keeping the working structure wherever it is sound.

  • Infinity edge and water features
  • Sun shelves and built-in seating
  • Raised spa and jacuzzi integration
  • New decking and coping design
  • Coloured and LED lighting schemes
  • Automation and cover systems
Pool Remodel Dubai 200
What's Included

Our Pool Remodel Scope

01

Structural reuse

Keep sound structure, spend more on the visible upgrade.

02

Evening impact

Lighting and water features designed for night-time use.

03

Family-safe

Non-slip finishes and safe depth transitions.

Deliverables

How We Deliver Pool Remodel

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Infinity edge and water features
  • Sun shelves and built-in seating
  • Raised spa and jacuzzi integration
  • New decking and coping design
Swimming Pools Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Swimming Pools

Related Services

FAQ

Pool Remodel — Questions & Answers

How long does it take to build a villa pool?

A typical 8 × 4 m pool takes 8–12 weeks including excavation, shell, waterproofing, tiling, equipment installation, commissioning and deck finishing. Curing and waterproofing periods set the minimum timeline.

Why is my pool losing water?

Common causes are failed waterproofing, cracked shell, leaking light niches, skimmer or pipe joints, and evaporation in summer. We pressure-test the circuit and inspect the shell to identify the true cause before quoting repairs.

Do you provide pool maintenance after handover?

Yes. Weekly and monthly maintenance contracts cover water testing, chemical dosing, filter cleaning, equipment checks and seasonal adjustments.

Can you make an old pool look new without rebuilding it?

In many cases yes — new mosaic or glass tiling, LED lighting, upgraded pumps and filters, new coping and deck, and modern water features transform a dated pool at a fraction of rebuild cost.

Start Your Project

Get a Fixed Quote for Pool Remodel

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now