Sat – Thu : 8.00 – 18.00
Construction • Service

RCC & Steel Structures

Reinforced concrete and structural steel executed to code with full documentation.

RCC & Steel Structures
Programme set per structureTypical timeline
Programme set per structureProduction programme
Construction divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

RCC & Steel Structures in Dubai

Foundations, raft slabs, columns, beams, shoring and heavy steel frames are the backbone of every project we deliver. Our structure teams work to ACI, BS and Dubai Municipality standards with cube testing, mill certificates and inspection records for every pour.

For steel we fabricate and erect portals, canopies, staircases and mezzanine frames, complete with primer and intumescent paint systems where fire ratings are required.

  • Shoring, excavation support and dewatering
  • Raft and isolated footings
  • RCC columns, beams, slabs and staircases
  • Structural steel fabrication & erection
  • Concrete cube testing and NDT records
  • Corrosion protection and fire-rated paint
RCC & Steel Structures Dubai 5
What's Included

Our RCC & Steel Structures Scope

01

Documented quality

Cube results, steel certificates and inspection reports compiled for handover.

02

Licensed engineers

Design and shop drawings by qualified structural engineers.

03

Safe sites

Method statements, permits and trained rigging crews on every lift.

Deliverables

How We Deliver RCC & Steel Structures

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Shoring, excavation support and dewatering
  • Raft and isolated footings
  • RCC columns, beams, slabs and staircases
  • Structural steel fabrication & erection
Construction Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Construction

Related Services

FAQ

RCC & Steel Structures — Questions & Answers

How long does a new villa take to build?

A typical G+1 villa of 4,000–6,000 sq.ft takes 10–14 months from permit to handover, including MEP and finishing. Extensions and single-floor additions usually run 8–16 weeks.

Do you handle Dubai Municipality and Trakhees approvals?

Yes. We prepare drawings, submit, follow up and close out permits with Dubai Municipality, Trakhees, DDA, DEWA and Civil Defence as part of the contract — you do not deal with the offices yourself.

Is the BOQ fixed or estimate?

You receive a detailed, itemised BOQ with quantities and rates. Once approved, lump-sum items are locked; only client-initiated changes are treated as variations.

Can I supply my own materials?

Absolutely. We can work on a supply-and-fix basis, or handle procurement end-to-end with approved-brand submittals for your sign-off.

Start Your Project

Get a Fixed Quote for RCC & Steel Structures

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now