Pool design, construction, renovation and remodeling with premium finishes.
A pool is a concrete structure, a waterproofing system, a hydraulic circuit and a finish — all of which must be right. We design and build pools and water features for villas and hotels, and renovate pools that leak, look dated or lose water.
Our scope includes excavation, RCC shell, waterproofing, tiling or mosaic, filtration and pumps, heating, lighting, automated covers and the deck and coping around it.
We design the pool around how you will use it: lap swimming, children's play, a sun shelf, a swim-up bar or a water feature. Depth profiles, steps, benches and lighting are planned before excavation.
The design package covers hydraulic layout, equipment sizing, electrical provisions, deck levels and the relationship between pool, pergola and garden.
We build pools in reinforced concrete with a fully tanked waterproofing system, then tile, fit equipment, pressure test and commission before handover.
Every stage is inspected: steel spacing and cover, concrete pour quality, waterproofing membrane continuity, tile adhesion and hydraulic pressure test results.
We renovate pools that lose water, look tired or run on inefficient equipment. The work starts with a diagnosis: pressure testing the lines, dye testing fittings and inspecting the shell for structural cracks.
Then we repair the cause, renew waterproofing, re-tile and modernise the plant room with efficient pumps, filters, LED lighting and heating.
Remodeling changes the pool's character: a new infinity edge, an extended sun shelf, a raised spa, a modern deck, integrated seating or a lighting scheme that turns the pool into the evening centrepiece.
We reshape what exists and rebuild what must change, keeping the working structure wherever it is sound.
Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.
Drawings, 3D views where required, and a transparent itemised bill of quantities.
Municipality, community and DEWA permits prepared, submitted and followed up for you.
Structured execution with weekly reporting, QC checklists and stage inspections.
Snag-free finishing, warranties, as-built documents and key handover.
The questions our swimming pools clients ask most before signing.
A typical 8 × 4 m pool takes 8–12 weeks including excavation, shell, waterproofing, tiling, equipment installation, commissioning and deck finishing. Curing and waterproofing periods set the minimum timeline.
Common causes are failed waterproofing, cracked shell, leaking light niches, skimmer or pipe joints, and evaporation in summer. We pressure-test the circuit and inspect the shell to identify the true cause before quoting repairs.
Yes. Weekly and monthly maintenance contracts cover water testing, chemical dosing, filter cleaning, equipment checks and seasonal adjustments.
In many cases yes — new mosaic or glass tiling, LED lighting, upgraded pumps and filters, new coping and deck, and modern water features transform a dated pool at a fraction of rebuild cost.
Glass mosaic and porcelain are the most durable options in UAE water chemistry, with stone coping for heat resistance. We also install natural stone and textured finishes for a resort look.