Home Renovation • Service

Home Refurbishment

Cosmetic refresh for resale or rentals — fast, tidy and turnover-ready.

Home Refurbishment
2–6 weeksTypical timeline
2–6 weeksProduction programme
Home Renovation divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Home Refurbishment in Dubai

When a property needs to look its best for sale, handover or a new tenant, refurbishment delivers maximum visual impact for a controlled budget: paint, lighting, floors, joinery repairs and deep cleaning.

These projects are scheduled tightly and often completed in a few weeks, with invoices structured in stages.

  • Full interior repainting
  • Lighting replacement and additions
  • Floor polishing, repair or replacement
  • Kitchen and joinery cosmetic repairs
  • Bathroom re-sealing and upgrades
  • Deep cleaning before handover
Home Refurbishment Dubai 21
What's Included

Our Home Refurbishment Scope

01

Fast turnaround

Short, tightly sequenced programmes.

02

Rental ready

Durable finishes chosen for high-turnover use.

03

Photo-ready

Deep cleaned and staged for viewings or handover.

Deliverables

How We Deliver Home Refurbishment

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Full interior repainting
  • Lighting replacement and additions
  • Floor polishing, repair or replacement
  • Kitchen and joinery cosmetic repairs
Home Renovation Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Home Renovation

Related Services

FAQ

Home Refurbishment — Questions & Answers

Can we stay in the house during renovation?

In most cases yes. We phase the works, seal off work zones with dust barriers, keep at least one bathroom and kitchen usable and agree working hours that respect your family's routine.

How do you price a renovation?

After a measured survey we issue an itemised BOQ with clear assumptions about what is retained and what is replaced. Hidden conditions — such as a damaged waterproofing layer — are flagged as contingency rather than surprise extras.

Do we need approval to renovate internally?

Internal non-structural renovation usually needs only landlord, developer and community NOCs. Structural changes, extensions or changes to the facade require municipality approval, which we handle.

How long does a villa renovation take?

A single majlis or kitchen takes 4–8 weeks. A full villa renovation of 4,000–6,000 sq.ft generally runs 10–20 weeks depending on scope.

Start Your Project

Get a Fixed Quote for Home Refurbishment

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.