Sat – Thu : 8.00 – 18.00
MEP Division • Service

HVAC & Ventilation Systems

Split, ducted, VRF and chiller systems with ventilation and air quality designed in.

HVAC & Ventilation Systems
2–5 weeks by system sizeTypical timeline
2–5 weeks by system sizeProduction programme
MEP Division divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

HVAC & Ventilation Systems in Dubai

Comfort in Dubai is an engineering result, not a bigger unit. We calculate cooling load room by room, select equipment, then design duct and pipe routes with proper insulation, drainage and access for maintenance.

Ventilation, kitchen extract, bathroom extraction and fresh-air provision are designed together with the AC so humidity and odours never become a problem.

  • Heat-load calculation per room
  • Split, ducted, VRF and chiller systems
  • Duct design, insulation and diffusers
  • Kitchen and bathroom ventilation
  • Fresh air and dehumidification provision
  • Testing, balancing and commissioning
HVAC & Ventilation Systems Dubai 18
What's Included

Our HVAC & Ventilation Systems Scope

01

Right-sized

We size for your actual load — no overselling tonnage.

02

Serviceable routes

Filters, drain pans and valves placed where technicians can reach them.

03

Quiet operation

Acoustic treatment on duct runs and equipment pads.

Deliverables

How We Deliver HVAC & Ventilation Systems

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Heat-load calculation per room
  • Split, ducted, VRF and chiller systems
  • Duct design, insulation and diffusers
  • Kitchen and bathroom ventilation
MEP Division Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From MEP Division

Related Services

FAQ

HVAC & Ventilation Systems — Questions & Answers

Can you retrofit full MEP into an older villa?

Yes. We survey the existing services, then design a retrofit that avoids structural damage — using dropped ceilings, surface trunking in service areas and concealed routes wherever possible.

Do you supply equipment as well as install it?

We work with tier-one brands such as Daikin, O General, LG, Schneider, Legrand and Grundfos, and can supply-and-install or install client-supplied equipment on a supply-and-fix basis.

Will you provide load calculations and shop drawings?

Always. Cooling load, electrical load schedule, single-line diagram, plumbing riser and duct layouts are issued for approval before installation.

Is smart home automation worth it during construction?

It is significantly cheaper to wire during construction than to retrofit. Pre-wiring for automation adds a small percentage to the MEP package and future-proofs lighting, blinds and HVAC control.

Start Your Project

Get a Fixed Quote for HVAC & Ventilation Systems

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now