Sat – Thu : 8.00 – 18.00
MEP Division • Service

Plumbing & Solar Heating

Water supply, drainage, pumps, tanks and solar water heaters installed to code.

Plumbing & Solar Heating
1–4 weeks by scopeTypical timeline
1–4 weeks by scopeProduction programme
MEP Division divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Plumbing & Solar Heating in Dubai

Leaks and low pressure are the two complaints we hear most. We design supply and drainage layouts with correct pipe sizing, pressure boosting, insulated hot-water lines and accessible valves.

Solar water heating with an electric backup is standard for villas — a simple system that cuts water-heating energy significantly in the UAE's sunshine hours.

  • Cold and hot water distribution
  • Drainage, vent and storm connections
  • Water tanks, pumps and pressurisation
  • Solar water heating systems
  • Water filtration and softeners
  • Pressure testing and leak rectification
Plumbing & Solar Heating Dubai 40
What's Included

Our Plumbing & Solar Heating Scope

01

Pressure checked

Flow and pressure tested before ceilings close.

02

Accessible valves

Isolation points placed where you can reach them.

03

Insulated lines

Hot water and chilled lines insulated to save energy.

Deliverables

How We Deliver Plumbing & Solar Heating

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Cold and hot water distribution
  • Drainage, vent and storm connections
  • Water tanks, pumps and pressurisation
  • Solar water heating systems
MEP Division Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From MEP Division

Related Services

FAQ

Plumbing & Solar Heating — Questions & Answers

Can you retrofit full MEP into an older villa?

Yes. We survey the existing services, then design a retrofit that avoids structural damage — using dropped ceilings, surface trunking in service areas and concealed routes wherever possible.

Do you supply equipment as well as install it?

We work with tier-one brands such as Daikin, O General, LG, Schneider, Legrand and Grundfos, and can supply-and-install or install client-supplied equipment on a supply-and-fix basis.

Will you provide load calculations and shop drawings?

Always. Cooling load, electrical load schedule, single-line diagram, plumbing riser and duct layouts are issued for approval before installation.

Is smart home automation worth it during construction?

It is significantly cheaper to wire during construction than to retrofit. Pre-wiring for automation adds a small percentage to the MEP package and future-proofs lighting, blinds and HVAC control.

Start Your Project

Get a Fixed Quote for Plumbing & Solar Heating

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now