Sat – Thu : 8.00 – 18.00
Home Renovation • Service

Home Renovation

Repair and upgrade what exists — floors, walls, kitchens, bathrooms and services.

Home Renovation
4–20 weeks by scopeTypical timeline
4–20 weeks by scopeProduction programme
Home Renovation divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Home Renovation in Dubai

Renovation keeps the structure you already paid for and upgrades everything you touch. We repair damp and cracks, replace failed waterproofing, modernise kitchens and bathrooms, upgrade flooring and refresh finishes throughout.

Because we are also a contracting company, we can strengthen or open up structure when a renovation needs it — no separate contractor, no interface gaps.

  • Damp, leak and crack repairs
  • Kitchen and bathroom replacement
  • Flooring and wall finish upgrades
  • Door, window and joinery replacement
  • Electrical and plumbing upgrades
  • Paint, lighting and decoration
Home Renovation Dubai 120
What's Included

Our Home Renovation Scope

01

Diagnose before quoting

We open, test and confirm the cause first.

02

Occupied-home ready

Phased programme, dust control, daily clean-up.

03

Waste managed

Debris removed with skip permits and documented disposal.

Deliverables

How We Deliver Home Renovation

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Damp, leak and crack repairs
  • Kitchen and bathroom replacement
  • Flooring and wall finish upgrades
  • Door, window and joinery replacement
Home Renovation Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Home Renovation

Related Services

FAQ

Home Renovation — Questions & Answers

Can we stay in the house during renovation?

In most cases yes. We phase the works, seal off work zones with dust barriers, keep at least one bathroom and kitchen usable and agree working hours that respect your family's routine.

How do you price a renovation?

After a measured survey we issue an itemised BOQ with clear assumptions about what is retained and what is replaced. Hidden conditions — such as a damaged waterproofing layer — are flagged as contingency rather than surprise extras.

Do we need approval to renovate internally?

Internal non-structural renovation usually needs only landlord, developer and community NOCs. Structural changes, extensions or changes to the facade require municipality approval, which we handle.

How long does a villa renovation take?

A single majlis or kitchen takes 4–8 weeks. A full villa renovation of 4,000–6,000 sq.ft generally runs 10–20 weeks depending on scope.

Start Your Project

Get a Fixed Quote for Home Renovation

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now