Recladding, repainting, repaving and lighting upgrades that modernise an old facade.
Older villas rarely need demolition — they need a new skin. We strip failing render, repair cracks and damp, then reclad or repaint with modern textures, add feature panels and rebuild gateways and paving.
Exterior renovation is the highest-visibility money you can spend on a property. Most clients see the difference in a single photograph from the street.
15
Substrate repair and priming — the reason our finishes last.
Front, sides and rear sequenced so you always have access.
Site cleared, washed and landscaping reinstated.
Every stage is inspected and documented, and you receive dated photographic evidence of progress.
Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.
Drawings, 3D views where required, and a transparent itemised bill of quantities.
Municipality, community and DEWA permits prepared, submitted and followed up for you.
Structured execution with weekly reporting, QC checklists and stage inspections.
Snag-free finishing, warranties, as-built documents and key handover.
3D facade concepts, material boards and lighting layouts before a single block is cut.
Boundary walls, gates, driveways, pergolas, shades, lighting and everything outside the villa.
Facades, ACP cladding, canopies, automatic doors, staircases and railings for buildings.
Yes. Facade, boundary-wall and gate changes normally need developer/landlord NOC plus municipality approval. We prepare drawings and submissions and wait for the green light before ordering materials.
Most works are done externally and can run while you are at home. We protect landscaping, keep access clear and work within the community noise hours.
Porcelain and natural stone for paving, powder-coated aluminium and ACP for cladding, stainless or hot-dip galvanised steel for gates and railings — all chosen for heat, humidity and salt resistance.
A driveway with base course and porcelain pavers takes 2–4 weeks. Boundary walls with gate and lighting usually run 3–6 weeks depending on length.