Sat – Thu : 8.00 – 18.00
Swimming Pools • Service

Pool Renovation

Leak repair, re-waterproofing, re-tiling and equipment replacement for existing pools.

Pool Renovation
3–6 weeksTypical timeline
3–6 weeksProduction programme
Swimming Pools divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Pool Renovation in Dubai

We renovate pools that lose water, look tired or run on inefficient equipment. The work starts with a diagnosis: pressure testing the lines, dye testing fittings and inspecting the shell for structural cracks.

Then we repair the cause, renew waterproofing, re-tile and modernise the plant room with efficient pumps, filters, LED lighting and heating.

  • Leak detection and pressure testing
  • Crack injection and structural repair
  • New waterproofing and re-tiling
  • Light niche and skimmer replacement
  • Pump, filter and heater upgrades
  • Deck and coping replacement
Pool Renovation Dubai 0
What's Included

Our Pool Renovation Scope

01

Diagnosis first

We repair the cause, not just the symptom.

02

Modern plant room

Variable-speed pumps that cut electricity bills.

03

Minimal disruption

Works sequenced so the garden stays usable.

Deliverables

How We Deliver Pool Renovation

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Leak detection and pressure testing
  • Crack injection and structural repair
  • New waterproofing and re-tiling
  • Light niche and skimmer replacement
Swimming Pools Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Swimming Pools

Related Services

FAQ

Pool Renovation — Questions & Answers

How long does it take to build a villa pool?

A typical 8 × 4 m pool takes 8–12 weeks including excavation, shell, waterproofing, tiling, equipment installation, commissioning and deck finishing. Curing and waterproofing periods set the minimum timeline.

Why is my pool losing water?

Common causes are failed waterproofing, cracked shell, leaking light niches, skimmer or pipe joints, and evaporation in summer. We pressure-test the circuit and inspect the shell to identify the true cause before quoting repairs.

Do you provide pool maintenance after handover?

Yes. Weekly and monthly maintenance contracts cover water testing, chemical dosing, filter cleaning, equipment checks and seasonal adjustments.

Can you make an old pool look new without rebuilding it?

In many cases yes — new mosaic or glass tiling, LED lighting, upgraded pumps and filters, new coping and deck, and modern water features transform a dated pool at a fraction of rebuild cost.

Start Your Project

Get a Fixed Quote for Pool Renovation

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now