Sat – Thu : 8.00 – 18.00
Construction

Construction Division

Turnkey builds, extensions and structures — engineered, approved and delivered.

Construction Division
12Quality assured
6 specialised servicesDelivered by in-house teams
1 yrWorkmanship warranty
Site survey within 48 hoursTypical response
Transparent BOQItemised rates & quantities
Construction team on site in Dubai
Overview

Construction at Alruqi Almotamiza

Our construction division builds villas, extensions and commercial structures across Dubai and the wider UAE. Every project starts with a survey and an itemised BOQ, then runs on a single programme covering structure, MEP and finishing so nothing falls between contractors.

In-house engineers, steel-fixers, masons and finishing crews work under one project manager with weekly photo reporting, so you always know exactly what was built this week and what comes next.

  • Free site survey in Dubai
  • Itemised BOQ before you commit
  • Weekly progress reporting
  • Authority approvals handled
Turnkey Villa Construction in Dubai
Service 01 • Construction

Turnkey Villa Construction

One contract, one programme, one accountable team. We take your plot from excavation and piling right through to the final coat of paint — structure, blockwork, MEP, insulation, waterproofing, joinery, finishes and landscaping.

Because our MEP, joinery and finishing divisions are in-house, villa handover dates stop drifting. You get a single project manager, weekly progress reports with photographs, and a snag list that is closed before the keys change hands.

  • Fixed programme — Weekly reporting against a plotted Gantt so delays surface early and get solved.
  • Transparent BOQ — Itemised quantities, brands and rates — no lump-sum surprises mid-build.
  • Quality gates — Stage-wise QC checklists signed by our engineer before concrete pours and tile-laying.
Villa Extensions & Modifications in Dubai
Service 02 • Construction

Villa Extensions & Modifications

Adding a floor, extending the majlis, joining two units or opening up a load-bearing wall all depend on getting the structure — and the approval — right. Our engineers assess the existing building, model the new loads and design the reinforcement before a single wall comes down.

We work in occupied homes with dust screens, working-hour agreements and phased shut-downs of water and power so family life continues while the extension goes up.

  • Occupied-home protocol — Dust control, protected access routes and daily site cleaning.
  • Structural safety first — Load calculations and strengthening designs issued before demolition.
  • Seamless finish — New works matched to existing levels, textures and paint sheen.
RCC & Steel Structures in Dubai
Service 03 • Construction

RCC & Steel Structures

Foundations, raft slabs, columns, beams, shoring and heavy steel frames are the backbone of every project we deliver. Our structure teams work to ACI, BS and Dubai Municipality standards with cube testing, mill certificates and inspection records for every pour.

For steel we fabricate and erect portals, canopies, staircases and mezzanine frames, complete with primer and intumescent paint systems where fire ratings are required.

  • Documented quality — Cube results, steel certificates and inspection reports compiled for handover.
  • Licensed engineers — Design and shop drawings by qualified structural engineers.
  • Safe sites — Method statements, permits and trained rigging crews on every lift.
Authority Approvals in Dubai
Service 04 • Construction

Authority Approvals

Most delays in Dubai construction are paperwork, not concrete. We prepare the submission drawings, fill the forms, pay the fees, respond to comments and collect the permits — and keep chasing until they are in your hand.

Landlord NOCs, community developer approvals (Emaar, Nakheel, Meraas, DDA), DEWA power releases and Civil Defence fire NOCs are all part of the service.

  • One point of contact — A dedicated approvals coordinator updates you every 48 hours.
  • Comment response — Technical replies to authority comments prepared by our engineers.
  • As-built dossiers — Completion documents compiled for property registration.
Commercial Building Construction in Dubai
Service 05 • Construction

Commercial Building Construction

We build commercial shells and fit-out-ready cores for offices, clinics, restaurants, retail units and warehouses — designed around your operational milestones and lease dates.

Structure, MEP rough-in, fire-fighting provisions and façade interfaces are coordinated so tenants can start their own fit-out the day they take the floor.

  • Programme driven — Milestones tied to lease and opening dates.
  • Compliance ready — Works executed to Civil Defence and municipality codes.
  • Tenant friendly — Service risers, loads and clear heights documented for fit-out teams.
Commercial Building Maintenance in Dubai
Service 06 • Construction

Commercial Building Maintenance

Buildings age from the plant room outward. Our maintenance teams handle planned preventive maintenance, reactive call-outs, civil repairs and statutory inspections across offices, retail spaces and residential buildings.

You get a monthly asset report, a record of every job ticket and a priority response line for emergencies such as water leaks, power faults or HVAC failures.

  • Service contracts — Clear monthly retainers with defined response times.
  • Ticket history — Every visit documented with parts used and photos.
  • Asset life planning — Replacement budgets flagged a year ahead.
How We Work

Our Delivery Process

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

0+

Villas & extensions built

0+

Years in the UAE

0+

Engineers & technicians

0 yr

Workmanship warranty

FAQ

Construction — Questions Answered

The questions our construction clients ask most before signing.

How long does a new villa take to build?

A typical G+1 villa of 4,000–6,000 sq.ft takes 10–14 months from permit to handover, including MEP and finishing. Extensions and single-floor additions usually run 8–16 weeks.

Do you handle Dubai Municipality and Trakhees approvals?

Yes. We prepare drawings, submit, follow up and close out permits with Dubai Municipality, Trakhees, DDA, DEWA and Civil Defence as part of the contract — you do not deal with the offices yourself.

Is the BOQ fixed or estimate?

You receive a detailed, itemised BOQ with quantities and rates. Once approved, lump-sum items are locked; only client-initiated changes are treated as variations.

Can I supply my own materials?

Absolutely. We can work on a supply-and-fix basis, or handle procurement end-to-end with approved-brand submittals for your sign-off.

Do you provide structural design and drawings?

Our licensed structural engineers produce RCC and steel designs, shop drawings and as-built documentation, co-ordinated with architectural and MEP drawings.

Start Your Project

Ready to Start Your Construction Project?

Share your plot or unit details and our engineer will survey, measure and quote within five working days.

Free Quote Call Now