Sat – Thu : 8.00 – 18.00
Swimming Pools • Service

Pool Design

Shape, depth, hydraulics, lighting and deck design coordinated with your landscape.

Pool Design
7–14 daysTypical timeline
7–14 daysProduction programme
Swimming Pools divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Pool Design in Dubai

We design the pool around how you will use it: lap swimming, children's play, a sun shelf, a swim-up bar or a water feature. Depth profiles, steps, benches and lighting are planned before excavation.

The design package covers hydraulic layout, equipment sizing, electrical provisions, deck levels and the relationship between pool, pergola and garden.

  • Shape, size and depth profiling
  • Hydraulic and filtration design
  • Lighting and water feature planning
  • Deck, coping and surrounding levels
  • Equipment selection and sizing
  • 3D visuals and material palettes
Pool Design Dubai 3D
What's Included

Our Pool Design Scope

01

Right-sized equipment

Pumps, filters and heaters selected by volume, not habit.

02

Efficient hydraulics

Lower pump pressure means lower running costs.

03

Integrated with landscape

Pool, deck and planting designed as one space.

Deliverables

How We Deliver Pool Design

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Shape, size and depth profiling
  • Hydraulic and filtration design
  • Lighting and water feature planning
  • Deck, coping and surrounding levels
Swimming Pools Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Swimming Pools

Related Services

FAQ

Pool Design — Questions & Answers

How long does it take to build a villa pool?

A typical 8 × 4 m pool takes 8–12 weeks including excavation, shell, waterproofing, tiling, equipment installation, commissioning and deck finishing. Curing and waterproofing periods set the minimum timeline.

Why is my pool losing water?

Common causes are failed waterproofing, cracked shell, leaking light niches, skimmer or pipe joints, and evaporation in summer. We pressure-test the circuit and inspect the shell to identify the true cause before quoting repairs.

Do you provide pool maintenance after handover?

Yes. Weekly and monthly maintenance contracts cover water testing, chemical dosing, filter cleaning, equipment checks and seasonal adjustments.

Can you make an old pool look new without rebuilding it?

In many cases yes — new mosaic or glass tiling, LED lighting, upgraded pumps and filters, new coping and deck, and modern water features transform a dated pool at a fraction of rebuild cost.

Start Your Project

Get a Fixed Quote for Pool Design

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now