Sat – Thu : 8.00 – 18.00
Swimming Pools • Service

Pool Construction

Excavation to commissioning — RCC shell, waterproofing, tiling and equipment.

Pool Construction
8–12 weeks typicalTypical timeline
8–12 weeks typicalProduction programme
Swimming Pools divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Pool Construction in Dubai

We build pools in reinforced concrete with a fully tanked waterproofing system, then tile, fit equipment, pressure test and commission before handover.

Every stage is inspected: steel spacing and cover, concrete pour quality, waterproofing membrane continuity, tile adhesion and hydraulic pressure test results.

  • Excavation and dewatering
  • RCC shell and reinforcement
  • Tanking and waterproofing systems
  • Glass mosaic, porcelain or stone tiling
  • Pumps, filters, heating and dosing
  • Pressure testing and commissioning
Pool Construction Dubai 60
What's Included

Our Pool Construction Scope

01

Stage inspections

Signed checklists before each cover-up stage.

02

Realistic curing

Programmes that respect concrete and waterproofing cure times.

03

Commissioned properly

Balanced hydraulics and chemical start-up on handover day.

Deliverables

How We Deliver Pool Construction

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Excavation and dewatering
  • RCC shell and reinforcement
  • Tanking and waterproofing systems
  • Glass mosaic, porcelain or stone tiling
Swimming Pools Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Swimming Pools

Related Services

FAQ

Pool Construction — Questions & Answers

How long does it take to build a villa pool?

A typical 8 × 4 m pool takes 8–12 weeks including excavation, shell, waterproofing, tiling, equipment installation, commissioning and deck finishing. Curing and waterproofing periods set the minimum timeline.

Why is my pool losing water?

Common causes are failed waterproofing, cracked shell, leaking light niches, skimmer or pipe joints, and evaporation in summer. We pressure-test the circuit and inspect the shell to identify the true cause before quoting repairs.

Do you provide pool maintenance after handover?

Yes. Weekly and monthly maintenance contracts cover water testing, chemical dosing, filter cleaning, equipment checks and seasonal adjustments.

Can you make an old pool look new without rebuilding it?

In many cases yes — new mosaic or glass tiling, LED lighting, upgraded pumps and filters, new coping and deck, and modern water features transform a dated pool at a fraction of rebuild cost.

Start Your Project

Get a Fixed Quote for Pool Construction

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.

Free Quote Call Now