Excavation to commissioning — RCC shell, waterproofing, tiling and equipment.
We build pools in reinforced concrete with a fully tanked waterproofing system, then tile, fit equipment, pressure test and commission before handover.
Every stage is inspected: steel spacing and cover, concrete pour quality, waterproofing membrane continuity, tile adhesion and hydraulic pressure test results.
60
Signed checklists before each cover-up stage.
Programmes that respect concrete and waterproofing cure times.
Balanced hydraulics and chemical start-up on handover day.
Every stage is inspected and documented, and you receive dated photographic evidence of progress.
Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.
Drawings, 3D views where required, and a transparent itemised bill of quantities.
Municipality, community and DEWA permits prepared, submitted and followed up for you.
Structured execution with weekly reporting, QC checklists and stage inspections.
Snag-free finishing, warranties, as-built documents and key handover.
A typical 8 × 4 m pool takes 8–12 weeks including excavation, shell, waterproofing, tiling, equipment installation, commissioning and deck finishing. Curing and waterproofing periods set the minimum timeline.
Common causes are failed waterproofing, cracked shell, leaking light niches, skimmer or pipe joints, and evaporation in summer. We pressure-test the circuit and inspect the shell to identify the true cause before quoting repairs.
Yes. Weekly and monthly maintenance contracts cover water testing, chemical dosing, filter cleaning, equipment checks and seasonal adjustments.
In many cases yes — new mosaic or glass tiling, LED lighting, upgraded pumps and filters, new coping and deck, and modern water features transform a dated pool at a fraction of rebuild cost.