Change the layout, look and feel — knock throughs, new kitchens and new interiors.
Remodeling changes how a home works: walls move, rooms are combined, a closed kitchen becomes open plan, and interiors are completely re-imagined.
We produce design drawings and 3D views first, confirm structural safety, then demolish to a plan — not by guesswork.
3D
Layouts tested in 3D before any demolition starts.
Engineer-approved steel or RCC support where walls are removed.
Civil, MEP, joinery and finishing sequenced on one programme.
Every stage is inspected and documented, and you receive dated photographic evidence of progress.
Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.
Drawings, 3D views where required, and a transparent itemised bill of quantities.
Municipality, community and DEWA permits prepared, submitted and followed up for you.
Structured execution with weekly reporting, QC checklists and stage inspections.
Snag-free finishing, warranties, as-built documents and key handover.
In most cases yes. We phase the works, seal off work zones with dust barriers, keep at least one bathroom and kitchen usable and agree working hours that respect your family's routine.
After a measured survey we issue an itemised BOQ with clear assumptions about what is retained and what is replaced. Hidden conditions — such as a damaged waterproofing layer — are flagged as contingency rather than surprise extras.
Internal non-structural renovation usually needs only landlord, developer and community NOCs. Structural changes, extensions or changes to the facade require municipality approval, which we handle.
A single majlis or kitchen takes 4–8 weeks. A full villa renovation of 4,000–6,000 sq.ft generally runs 10–20 weeks depending on scope.