Home Renovation • Service

Home Remodeling

Change the layout, look and feel — knock throughs, new kitchens and new interiors.

Home Remodeling
6–20 weeksTypical timeline
6–20 weeksProduction programme
Home Renovation divisionIn-house team
Itemised BOQNo hidden extras
1-year warrantyWorkmanship cover
Overview

Home Remodeling in Dubai

Remodeling changes how a home works: walls move, rooms are combined, a closed kitchen becomes open plan, and interiors are completely re-imagined.

We produce design drawings and 3D views first, confirm structural safety, then demolish to a plan — not by guesswork.

  • Layout redesign and drawings
  • Non-structural and steel-supported knock-throughs
  • Open-plan kitchens and living areas
  • Full bathroom and wet-area rebuilds
  • New ceilings, floors and lighting design
  • Complete interior re-styling
Home Remodeling Dubai 3D
What's Included

Our Home Remodeling Scope

01

Design-led

Layouts tested in 3D before any demolition starts.

02

Structural cover

Engineer-approved steel or RCC support where walls are removed.

03

Coordinated trades

Civil, MEP, joinery and finishing sequenced on one programme.

Deliverables

How We Deliver Home Remodeling

Every stage is inspected and documented, and you receive dated photographic evidence of progress.

  • Layout redesign and drawings
  • Non-structural and steel-supported knock-throughs
  • Open-plan kitchens and living areas
  • Full bathroom and wet-area rebuilds
Home Renovation Approved contractor Fixed programme Stage QC checklists Weekly reporting
How We Work

Step by Step

01

Consultation & Survey

Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.

02

Design & BOQ

Drawings, 3D views where required, and a transparent itemised bill of quantities.

03

Approvals

Municipality, community and DEWA permits prepared, submitted and followed up for you.

04

Construction & MEP

Structured execution with weekly reporting, QC checklists and stage inspections.

05

Finishing & Handover

Snag-free finishing, warranties, as-built documents and key handover.

Also From Home Renovation

Related Services

FAQ

Home Remodeling — Questions & Answers

Can we stay in the house during renovation?

In most cases yes. We phase the works, seal off work zones with dust barriers, keep at least one bathroom and kitchen usable and agree working hours that respect your family's routine.

How do you price a renovation?

After a measured survey we issue an itemised BOQ with clear assumptions about what is retained and what is replaced. Hidden conditions — such as a damaged waterproofing layer — are flagged as contingency rather than surprise extras.

Do we need approval to renovate internally?

Internal non-structural renovation usually needs only landlord, developer and community NOCs. Structural changes, extensions or changes to the facade require municipality approval, which we handle.

How long does a villa renovation take?

A single majlis or kitchen takes 4–8 weeks. A full villa renovation of 4,000–6,000 sq.ft generally runs 10–20 weeks depending on scope.

Start Your Project

Get a Fixed Quote for Home Remodeling

Send us your details, drawings or photographs — we will revert with scope, programme and an itemised price.