3D facade concepts, material boards and lighting layouts before a single block is cut.
We start with your plot, orientation and the community's architectural rules, then produce elevations, 3D views and a material palette so you can see the finished facade before construction starts.
The design package includes facade proportions, cladding layout, gate and boundary design, paving patterns, planting positions and external lighting design — everything needed to price and build without guesswork.
3D
The team that draws it is the team that builds it.
Designs prepared within developer guidelines for first-time approval.
Every palette option shown with an indicative rate.
Every stage is inspected and documented, and you receive dated photographic evidence of progress.
Free site visit anywhere in Dubai with a senior engineer, plus a scope discussion and budget guidance.
Drawings, 3D views where required, and a transparent itemised bill of quantities.
Municipality, community and DEWA permits prepared, submitted and followed up for you.
Structured execution with weekly reporting, QC checklists and stage inspections.
Snag-free finishing, warranties, as-built documents and key handover.
Recladding, repainting, repaving and lighting upgrades that modernise an old facade.
Boundary walls, gates, driveways, pergolas, shades, lighting and everything outside the villa.
Facades, ACP cladding, canopies, automatic doors, staircases and railings for buildings.
Yes. Facade, boundary-wall and gate changes normally need developer/landlord NOC plus municipality approval. We prepare drawings and submissions and wait for the green light before ordering materials.
Most works are done externally and can run while you are at home. We protect landscaping, keep access clear and work within the community noise hours.
Porcelain and natural stone for paving, powder-coated aluminium and ACP for cladding, stainless or hot-dip galvanised steel for gates and railings — all chosen for heat, humidity and salt resistance.
A driveway with base course and porcelain pavers takes 2–4 weeks. Boundary walls with gate and lighting usually run 3–6 weeks depending on length.